Enterprise6 monthsArchitecture lead with 4 client engineers

Zero-Downtime Cloud Migration

Migrated 100TB to the cloud with zero customer-visible downtime

An enterprise SaaS client

An enterprise SaaS with brutal uptime SLAs needed to leave a colo facility that was being decommissioned. They had 100TB of operational data, customers in three regulated industries, and contracts that paid penalties for any minute of downtime. The path of least resistance - a maintenance-window cutover - was off the table. I led the migration as a parallel-run: every byte was replicated continuously, traffic shifted gradually behind a routing layer, and any phase could be reversed in minutes. We finished the migration with literally zero customer-visible downtime.

This is a representative architecture study based on real project patterns. Specific metrics and client details have been generalized to protect confidentiality.

Results

What changed, in numbers

The metrics the engagement is measured by.

0 minutes

Downtime

during the entire migration

100TB+

Data Migrated

with zero data loss

40%

Cost Reduction

infrastructure cost savings

+35%

Performance

improvement in p95 response times

Challenge

What was broken

An on-premise footprint that was rotting, contractual SLAs that didn't tolerate downtime, and a regulator that needed to approve the new architecture before any customer data crossed the boundary. The application also had a 15-year-old core with quirks the original engineers were no longer at the company to explain.

Solution

The shape of the fix

A parallel-run migration with continuous replication, per-tenant traffic shifting behind a routing edge, instant rollback at every phase, and weekly chaos exercises to prove the rollback worked. Boring on the day of cutover - which is exactly the goal.

Approach

How I tackled it

The concrete moves that took the project from broken to shipped.

1

Stood up the target AWS environment as a full parallel deployment, not a phased one

2

Built continuous replication for both transactional and blob data with end-to-end checksum validation

3

Added a routing edge that could shift traffic per-tenant, per-region, per-feature with instant rollback

4

Rehearsed cutover and failback weekly in a chaos-engineering style, including pulled-cable tests

5

Coordinated with the regulator early so the architecture was pre-approved before live data moved

6

Decommissioned the old environment only after 30 days of zero-issue parallel run

Outcomes

What shipped, and what it changed

Measured results from the engagement, told as a story rather than a scoreboard.

  • Zero minutes of customer-visible downtime across the entire 6-month migration

  • 100TB+ of data migrated with zero data-loss incidents

  • Cut steady-state infrastructure spend by 40% versus the colo footprint

  • Improved p95 application response time by 35% on the new platform

  • Cleared regulator review on the new architecture without findings

Stack

Technologies used

Linked entries open the technology page with related studies, playbooks, and notes.

Services

How I helped

The specific services involved in this engagement. Each links to a deeper breakdown.

Lessons

What I would tell the next team

The takeaways I carry into every similar engagement.

Parallel-run is the answer to almost every 'how do we migrate without downtime' question

Rollback is not a hope. If you have not rehearsed it under load this week, you do not have it

Regulators say yes faster when you bring them in early. They hate surprises more than they hate change

More patterns and playbooks live in Insights.